SF 1750
What counts as an emergency repair under SF 1750?
Updated September 22, 2026
The statute lists emergency repairs required to protect the health or safety of the unit owners, and significant damage that has to be addressed without delay to prevent further damage, among the six exceptions to the three-bid requirement that takes effect January 1, 2027. The emergency is the tarp. The reroof that follows is a planned project, and it deserves a real scope and a competitive bid. Both are what we do.
Hour one: stabilize, and sign nothing else
Ordering a crew to tarp an open roof or board broken windows is the correct move, immediately. No board should sit on active water intrusion while debating procurement rules. Get the property safe.
What a board should keep its pen away from in hour one: anything a door-knocking contractor puts in front of it. After every major Twin Cities hailstorm, crews canvass damaged associations with paperwork that reads like a repair authorization and functions like a full-project commitment. A signature that hands the whole rebuild to whoever knocked first costs the board its leverage before the project has even been scoped.
Where the emergency ends
This is the line boards miss. The emergency is the tarp, not the reroof. Once the property is stable, the permanent repair is a planned capital project: it can be scoped, documented, competitively bid, and awarded like any other large contract.
A useful discipline: have the board note in its minutes when the property was stabilized. That entry marks where emergency response ended and the planned project began, and it is the kind of record a board is glad to have a year later.
The paper trail that saves you later
- Photograph everything, before the tarps go on and after. Wide shots and close-ups, dated.
- Keep every emergency invoice separate from the rebuild costs. Two piles, from day one.
- Record the decisions, who authorized the emergency work, when, and why, in the minutes.
- Get the damage documented before repairs erase the evidence. That is what the Storm Damage Report is for: the damage separated from wear, with the photo record and the storm data, in a report the adjuster and the attorney can work from, and the scope that follows built on it.
The insurance decision comes next, slowly
Whether to file a claim is a real decision: it involves your deductible, your policy structure, your claims history, and what the damage actually is. Before filing, know what you have, with the damage documented and the options laid out side by side. The Storm Damage Report is written for that decision.
Then the rebuild is a normal bid
Scope written from documented damage, the board's bidder list, sealed bids, a recorded opening, a side-by-side comparison: the same process as any capital project, run by someone with no bid in the envelope. Storm rebuilds draw heavy vendor pressure, and a sealed, documented process is how the board stays in control of it.
Source: Minnesota Session Laws 2026, chapter 82, section 4. Back to SF 1750 and your board.
Storm damage on your property right now?
Call before you sign anything. The first call is free, and it might save the association real money. 612-440-8660.